Content Summary
A hydroelectric dam under construction in Serbia required dam monitoring of several environmental and structural properties to guarantee long-term strength and stability. Therefore the dam’s construction engineers put forth a proposal for a large number of geotechnical sensors to be installed and used during construction. These sensors included vibrating wire piezometers, joint meters, fill extensometers and strain gauges.
Each sensor needed to interface with a universal data logger as part of a long-term logging solution. Additionally, the engineers specified that their desired monitoring solution needed to have a large number of vibrating wire sensor inputs, compatibility with a SCADA system, and the ability for expansion.
Access this content
Choose an option below
Your content has been opened.
Register to access this content
Verify your email to access this content
Code sent. Enter it in the modal
Your content has been opened.
Why do I need to verify I’m human?
Please verify you are a human before opening this content.
Your content has been opened.
The content will open in a new window. You may need to allow popups for this site.